Corridor 11 of 12
Comberton Greenway
Coton village and Adams Road are done, but the review asked for one wall to be removed on Adams Road and the programme spent £2.4m there. The biggest new off-road route left in the programme, beyond Coton, is still at planning stage.
Under construction
What became of the 8 proposals for this corridor
What the 2016 review asked for
- Widen the Coton to M11 bridge path, 400 m (built, and already cracking)
- Repair the surface of the M11 bridge
- New ramps and path from the M11 bridge into West Cambridge, 300 m
- Remove the low wall at the Adams Road / Wilberforce Road junction
- Replace the Bin Brook bridge on Burrell's Walk
- A safe crossing of Long Road, assumed to be a new underpass
- New path on field edges and bridleway, Coton via Hardwick to Comberton Village College, 5 km
What happened
- Spring 2019Initial consultation.
- 25 June 2020Board approves the route at £9m.
- July 2022Camcycle consultation guide; Long Road is to get a parallel crossing, not an underpass.
- December 2022Executive Board approval to proceed.
- 29 September 2025Construction starts in Coton village.
- 13 October 2025Adams Road works begin on a £2.4m scheme, billed as England's first cycle street, on a road already carrying around 3,000 cyclists a day.
- 5 March 2026Full business case approved, together with the Sidgwick Avenue experimental traffic order.
- 2026Planning application submitted for the full route, Comberton to central Cambridge.
- August 2026Adams Road complete, after opening at the end of May and closing for about two weeks in August while substandard road markings were replaced at the contractor's expense.
- Early 2026Coton village complete, with a 20mph limit following later in the year.
Where it stands, November 2026
Part open, part in planning. Adams Road, Grange Road and Coton village are finished, and the path from Coton to the M11 bridge was widened some years ago, although it now has subsidence and cracking. The Cambridge end is not yet continuous: the new ramps and path from the M11 bridge into West Cambridge are still to be built, and the bridge surface still needs repair. The rural 5 km from Coton through Hardwick to Comberton Village College, the largest new off-road route left in the whole programme, is in the planning application. The review's assumed grade-separated Long Road crossing has become a surface parallel crossing; the review had argued that at peak times 'a safe crossing is important' and that a concrete box could be installed relatively quickly. The 2016 review asked for one change on Adams Road: remove a low wall at the Wilberforce Road junction. The programme spent £2.4m there instead, on wider footways, red surfacing, planting and junction work, on a street that already carried up to 3,000 cyclists a day. It is a better street. But it was highway land the council already controlled, while the 5km of new off-road path the same greenway needs beyond Coton is still at planning stage. 'Cycle street' is a description, not a legal designation: drivers are asked to stay behind people on bikes, not required to.
Sources for this page
- GCP — Greenways update, December 2025
- CycleStreets photo — the Coton path, cracking visible, August 2026
- CycleStreets photo — descent from the M11 bridge on the Coton path, August 2026
- GCP — Adams Road (£2.4m budget; scope of works)
- Cambridge Independent — Adams Road closed for repairs months after £2.4m upgrade, 19 August 2026
- Cycling Weekly — England's first cycle street opens
Every proposal on this route
| Proposed intervention (2016) | Type | Scale | Status 2026 | What happened |
|---|---|---|---|---|
| Widen and upgrade the path and ramps from the edge of Coton to the M11 bridge | Upgrade | 400 m | Built, already needs repair | Built, and already failing. Widened and upgraded several years ago, according to local cyclists, it has since suffered subsidence and longitudinal cracking, particularly on the bridge ramp, visible in August 2026 photographs. A further 300m from the edge of Coton to the village centre was resurfaced in 2026 with the Coton village works. |
| Repair the surface of the bridge over the M11 | Upgrade | 1 bridge | In design or planning | Some repairs have been made, but local cyclists describe the surface as still poor. Further work is in the scheme. |
| New ramps and path from the M11 bridge into the West Cambridge site at Charles Babbage Road | New route | 300 m | In design or planning | In the scheme — the link the review called it 'surprising' to have gone without. |
| Remove the low wall at the Adams Road / Wilberforce Road junction | Upgrade | — | Built and open | Removed as part of a much larger scheme. The review asked for this one change on Adams Road; the programme spent £2.4m on the street instead, making it what GCP calls England's first cycle street, completed in August 2026. See the Comberton route page. |
| Replace the Bin Brook bridge on Burrell's Walk with a wider one | New structure | new bridge | In design or planning | Still in the scheme, unbuilt. |
| Safe crossing of Long Road between Coton and Comberton — assumed to be a new underpass | New structure | underpass | Scaled back | The 2016 report assumed a grade-separated crossing, noting a concrete box could be installed quickly. The scheme now proposes a surface parallel crossing. |
| New path on field edges and bridleway from Coton via Hardwick to Comberton Village College | New route | 5 km | In design or planning | The largest surviving new off-road route in the programme; included in the 2026 planning application. |
| Investigate extending the route to Cambourne, the Eversdens, Barton and Bourn | New route | various | Not in current programme | Not progressed. |